Lakeside Hospital

CLIENT: Alegent Health System

CONSTRUCTION MANAGER: M-C-L McCarthy

ARCHITECT: Leo Daly And Holland Bassam

PROJECT VALUE: $13,400,000

PROJECT DURATION: 24 Months

PROJECT DELIVERY METHOD: Design/Bid/Build

SCOPE OF WORK: Plumbing, HVAC & Medical Gas

The Solution

Alegent Health had a vision to create a hospital with quality in technology and care ahead of its time.  Lakeside Hospital is considered one of the technologically integrated in the world, and serves nearly 100,000 people each year, including over 40,000 in the emergency department.  Ray Martin installed the HVAC, Plumbing, and Medical Gas for this building.

Square Feet

%

Air Treatment Specialties

Months

Amazing Result

Ray Martin Installs with Care

Atmospheric Diversity

With a facility with various care functions, Ray Martin ensured that each space was provided with its required performance levels while also balancing the mechanical system as a whole.

High Care Environment

For precise applications to accommodate for patients, especially in emergency care, the atmosphere must be perfect. Ray Martin ensured that the water and air handling were precisely what was requested.

Careful Completion

Ray Martin worked with the engineers and contractors to make sure that everyone was doing their part to make the building a sustainable, comfortable, and high-class hospital.

Some images of our work are below


  • Healthcare Specific Specialties 80%
  • Unique Water Handling Processes 50%
  • Engineers on Project 40%
  • National Awards 14%

The Ray Martin Results