Hixon Lied Center

CLIENT: Nebraska Medical Center

GENERAL CONTRACTOR: Kiewit Building Group

ARCHITECT: Leo A. Daly

PROJECT VALUE: $13,000,000

PROJECT DURATION: 24 Months

PROJECT DELIVERY METHOD: Design / Assist (GMP)

SCOPE OF WORK: Plumbing, HVAC & Medical Gas

The Solution

Named the Center for Clinical Excellence, this four-story facility provides the most clinically intense hospital functions. The Hixson-Lied Center holds 100+ spaces for emergency, radiology, surgery, interventional radiology, neonatal intensive care, and cystology.

Square Feet

Months

Specialties

Amazing Result

The Ray Martin Results

Scientific Labs

For precise applications the atmosphere must be perfect. Ray Martin ensured that the water and air handling were precisely what was requested.

Adapting for Change

Due to the center being located between two towers, a functioning utility plant, and existing campus infrastructure, utilities need to be relocated.  Ray Martin worked with the general contractor and school in sequencing and providing utilities to the existing buildings before installing a final project to accommodate for all the facilities.

Technological Resources

Ray Martin was able to assist in the design of the mechanical/plumbing systems by working with 3-D BIM design applications with the MEP engineers and architect.  3-D BIM is vital for planning ahead and catching any problem before it happens to save money in the long run.


  • Labs 120%
  • Students Using These 2000%
  • Experiments Conducted 100,0000%
  • Awards 60%

Attention to Detail

The 150,000-square-foot center houses the schools of medicine, pharmacy and nursing as well as the undergraduate departments of chemistry, biology, physics, environmental science and atmospheric science.