CLIENT: Alegent Health System
CONSTRUCTION MANAGER: M-C-L McCarthy
ARCHITECT: Leo Daly And Holland Bassam
PROJECT VALUE: $13,400,000
PROJECT DURATION: 24 Months
PROJECT DELIVERY METHOD: Design/Bid/Build
SCOPE OF WORK: Plumbing, HVAC & Medical Gas
The Solution
Alegent Health had a vision to create a hospital with quality in technology and care ahead of its time. Lakeside Hospital is considered one of the technologically integrated in the world, and serves nearly 100,000 people each year, including over 40,000 in the emergency department. Ray Martin installed the HVAC, Plumbing, and Medical Gas for this building.
Square Feet
%
Air Treatment Specialties
Months
Amazing Result
Ray Martin Installs with Care
Atmospheric Diversity
With a facility with various care functions, Ray Martin ensured that each space was provided with its required performance levels while also balancing the mechanical system as a whole.
High Care Environment
For precise applications to accommodate for patients, especially in emergency care, the atmosphere must be perfect. Ray Martin ensured that the water and air handling were precisely what was requested.
Careful Completion
Ray Martin worked with the engineers and contractors to make sure that everyone was doing their part to make the building a sustainable, comfortable, and high-class hospital.
- Healthcare Specific Specialties 80%
- Unique Water Handling Processes 50%
- Engineers on Project 40%
- National Awards 14%
The Ray Martin Results
Alex – I will need a paragraph here.